News


Inner Mongolia Sunway New Materials Co., Ltd. BDO Integration Project Publicity Draft


Inner Mongolia Sunway New Materials Co., Ltd.

Announcement of the Draft for Comments on the BDO Integration Project

According to the requirements of the "Interim Measures for Public Participation in Environmental Impact Assessment", the relevant content of the project's EIA report is hereby announced as a draft for comments, as follows:

1. Overview of the construction project

Project Name: BDO Integration Project of Inner Mongolia Sunway New Materials Co., Ltd.

Construction site: Low Carbon Industrial Park, Economic and Technological Development Zone, Wuhai City, Inner Mongolia Autonomous Region

Construction nature: new construction

Construction scale: The project is constructed in two phases, and this evaluation is only for the first phase of the project. Acetylene raw material unit 360,000 t/a; acetylene unit 100,000 t/a; formaldehyde unit 720,000 t/a; 1,4-butanediol unit 300,000 t/a; methanol hydrogen production unit 24,000 Nm3/h; PBAT The unit is 100,000 t/a; the PTMEG unit is 60,000 t/a; the waste sulfuric acid treatment unit is 30,000 t/a (two-phase scale, the first and second phases are built at the same time); the annual operating time of each unit is 8,000 hours, or 333 days. Supporting raw material workshop, power workshop, public works and auxiliary facilities.

Total investment: The total investment of this project is 4,366 million yuan.

2. Ways and Channels for Public Opinions

Construction unit: Inner Mongolia Sunway New Materials Co., Ltd.

Contact: Mr. Chen

Contact number: 15268860396

3. Overview of the evaluation unit

Evaluation unit: Inner Mongolia Xinzhong Ecological Environment Technology Co., Ltd.

4. Public announcement of the full text of the draft for comments on the environmental impact report

The website for downloading the public opinion form on the EIA of construction projects:

https://pan.baidu.com/s/1ob1gdxFp2fFLEPEK-zlUGA?pwd=xp6a Extraction code: xp6a

V. Public Scope for Solicitation of Comments

The construction unit shall listen to the opinions of citizens, legal persons and other organizations within the scope of environmental impact assessment in accordance with the law.

6. Online link to the public opinion form:

EIA public opinion form download website: http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

7. Ways and channels for the public to put forward the comment form

Within ten working days from the date of the announcement, fill in the public opinion form and submit it to the construction unit within the specified time to give feedback on the impact of the project on the construction environment.

Inner Mongolia Sunway New Materials Co., Ltd.

2022.1.4